Example of standard set-up: 1. Pre-handling, 2. CFC/Oil Suction Unit (Degasification stage I), 3+4. Super Chopper and Heavy Pre-Granulator, 5. Zig-Zag Wind Separator, 6. Pelletizer and Pellet Press (PUR), 7. Overband magnet., 8. Eddy Current Separator, 9. CFC/Pentane Liquefaction System. A. pre-handling, B. shredding, C. separation, D: degasification stage I and E: degasification stage II.
The standard setup of a complete Eldan Refridgerator Recycling System includes everything from pre-chopping to separation. This is also the starting point when plants are tailored to suit specific customer requirements. The standard systems can handle up to 40-50 or 70-80 refrigerators/hr.